What happens between your order and your delivery

By Liudmyla Babii, Co-Founder at GEROM7 min read
A worker operating a tube bending machine in a production hall

Key facts

  • Every catalogue item is a fixed drawing; what varies per order is a short list: model, size group, quantity, frame colour and top decor.
  • Production runs on a 30-day cycle from confirmed order to ready for dispatch.
  • The real risk in serial furniture is drift between repeat orders: shade, seat height, stacking fit.
  • Loads are palletised or loose depending on what fits, and the client knows which before the truck leaves.
  • Four updates: order confirmed, production started, order dispatched, delivery scheduled.

Most distributors we work with see two ends of this process clearly. There is the quote at the start, and there are the pallets at the end. Everything between those two points is a black box, and it stays a black box until something goes wrong in it.

That is a strange thing to leave unexamined, because the middle is where a supply relationship is actually decided. Anyone can get one order right. What separates a supplier you keep from a supplier you replace is what the second, fifth and twentieth order look like, and that comes down to how the middle is organised.

So this issue walks through it properly, in order, including the parts that are less flattering to show.

The first thing worth saying is that almost nothing in that box is invented for your order.

The range is standard, and that is the point

Every item in the catalogue exists as a fixed drawing. Tube diameter and wall thickness. Shell radius and the exact position of every hole. Weld points. The powder code, written down as a code and not as a colour name. Bolt sizes and cap types.

None of that gets revisited when an order comes in. It was decided once, built as a sample, corrected, and then locked. When your order enters production, nobody is deciding how the chair should be made. That question was answered years ago and the answer has not moved since.

This sounds like a limitation. In practice it is the opposite, because the variety in the range does not come from designing new products for each request. It comes from combining the same proven components in different ways. The same moulded plywood shell sits on a cantilever base and on a four-leg base. The same seat and backrest panels go onto a stacking frame and onto a height-adjustable one. Two components, four catalogue positions, one set of tooling.

The same shell on different bases: two components, several catalogue positions.

What actually varies from order to order is a short list: model, size group, quantity, frame colour, top decor. Nothing else moves. And because nothing else moves, there is very little for us to get wrong between your order confirmation and what comes off the line.

The real risk in serial furniture is drift

On a one-off project the risk is easy to name. A finish comes back wrong. A dimension shifts between the quote and the delivery. Everyone in this industry has a story like that.

Serial supply fails differently, and much more quietly. You order the same chair in March, then again in September, then again two years later for an extension to the same school. Nothing is ever obviously wrong. But by the third delivery the green is half a shade off from the chairs already in the room, the seat sits a few millimetres higher, and the stack does not sit as tight as it used to. Nobody rejects the order. The client just notices, and remembers, and next time asks whether there is another supplier.

That is the failure mode serial production has to be built against, and it is a boring problem with a boring answer. Welding is done on the same fixtures every run, so the geometry cannot wander. The powder code stays the same between batches instead of being matched by eye. The plywood shells come out of the same presses, so the curve is the same curve. A repeat order should be boring. Boring is the whole product.

Production runs on a 30-day cycle

Orders do not sit in a queue of individual jobs waiting their turn. They go into a production plan, and the plan is what gets executed.

That distinction matters more than it sounds. Frames are welded in runs. Coating is done in colour blocks rather than switching shade for every order. Shells are pressed and trimmed on their own schedule. All of it converges again at assembly, where the components for a specific order finally come together as products.

The result is 30 days from confirmed order to ready for dispatch. That is not a target we aim at and miss politely. It is a number a distributor can put in front of their own client before the order is even placed with us, which is usually when they need it, not after.

Packaging is designed once, per model

A packing scheme that works for a stacking chair does not work for a table top, and a scheme that works in a warehouse does not necessarily survive a thousand kilometres of road.

Each model has its own solution, worked out once and then repeated on every run. Corner protection where the corners actually take impact. Separation between coated surfaces so that painted metal never rests directly against a finished panel. Film on frames. Panels stacked flat and banded rather than stood on edge.

The reason this gets designed once rather than decided at the loading bay is that packing improvised per shipment is packing that varies per shipment. And packaging is the one part of the process the client sees before they see the product.

Finished goods sit in the warehouse before they move

Between assembly and the truck there is a stage nobody puts in a brochure: the order stands in the warehouse, packed, staged and checked against the order sheet before anything is loaded.

It is unglamorous and it is where most silent errors get caught. A missing carton of fixings. A colour that belongs to the next order. A count that is right on paper and wrong on the floor. Finding that in the warehouse costs an hour. Finding it after delivery costs a return shipment and a conversation with your client.

Packed orders are staged and checked against the order sheet before anything is loaded.

Loads are palletised or loose, depending on what fits

This is a decision made per shipment rather than a standing policy, and it is worth explaining because it is the part a distributor notices at the unloading bay.

Pallets make unloading fast. A forklift takes a pallet off the truck in seconds and no one touches the product by hand. They also eat height, leave voids between tiers and travel as dead weight, which on a full load of flat panels and stacked frames can cost a meaningful share of the truck.

So the format is chosen against the actual order. When the load has room, it goes out palletised. When the volume is tight and palletising would mean sending a second truck or leaving product behind, it goes loose, packed to fill the space properly rather than to fill it neatly.

The trade is real and it goes both ways. A loose load costs the receiving side more time and more hands at unloading. It costs the client less per unit delivered, sometimes considerably less, because the alternative is paying for air. On a full load or a recurring volume that trade is usually worth making, and on a small or mixed shipment it usually is not.

Either way, you know which one is coming before the truck leaves, not when it arrives. If your operation needs palletised loads regardless of the volume maths, say so at the order stage and we plan the shipment around it.

A loose load: packed to fill the space of the trailer.

Logistics

Once a load leaves production, it stays under our control until it is unloaded at your address.

Most of our deliveries go on trucks we work with directly. That is the simplest version: the team that took your order also manages the vehicle carrying it, so there is little to coordinate and nobody to chase for an update.

On some routes and at some volumes we use external carriers, and that is normal in this business. What is not normal is how loosely most suppliers handle it. A shipment gets handed to a forwarder, the forwarder hands it to a regional carrier, and by the time you ask where your order is, the answer depends on three companies that have never spoken to each other. We do not work that way. When an external carrier is used, we select the route ourselves, we track the load at every stage, and the carrier reports to us rather than to you.

In practice that means three things. One point of contact for shipment status, whichever truck the order is on. A delivery window based on a route we manage from end to end, including the border crossing, rather than a window inherited from someone else's schedule. And fewer handovers, which matters because handovers are where delays are created and where nobody is quite responsible for them.

If something does go wrong on the road, and occasionally it does, you find out from us with a revised time, not from a tracking page that stopped updating two days ago.

What this means on your side

Very little to manage, which is the point.

You get four updates: order confirmed, production started, order dispatched, delivery scheduled. Between those, nothing needs chasing. If something does move, you hear it from us before you hear it from your client.

Welding and coating are the easy parts of this process to film, and they are the parts everyone shows. Repeatability, packing, warehouse checks and routing are less photogenic. They are also what a distributor actually experiences, order after order, and what determines whether the twentieth order is as unremarkable as the first.

We are glad to walk any current or prospective partner through this in more detail, including how it works for recurring volumes, mixed loads and specific unloading requirements on your side. If that would be useful, reach out directly.

Questions buyers ask

How long does production take?

30 days from confirmed order to ready for dispatch. Orders go into a production plan: frames are welded in runs, coating is done in colour blocks, shells are pressed on their own schedule, and everything converges at assembly.

What varies from order to order?

Model, size group, quantity, frame colour and top decor. Everything else is locked in the fixed drawing.

Are loads palletised?

It is decided per shipment. Pallets speed up unloading but eat height and leave voids; a loose load costs the receiving side more time but can cost less per unit delivered. If a client needs palletised loads regardless, they should say so at the order stage.

Need the catalogue?Prices, catalogue and terms for distributors and project buyers.
Request the catalogue
Inside GEROMA LinkedIn newsletter for distributors and buyers of school and office furniture: how it's made and why it lasts.
Subscribe on LinkedIn
Liudmyla BabiiCo-Founder at GEROM · LinkedIn profile