GEROM / Inside GEROM / Market Watch

Inside GEROM · Market Watch

What you only find out three months later: defect claims and batch traceability

By Yevhenii Herasymovych, CEO at GEROM5 min read
Sealed, stretch-wrapped cardboard cartons on a pallet in a bright furniture warehouse aisle

Key facts

  • Furniture defects are rarely spotted at unloading. In schools they often show up months later, after the order is closed and the packaging is gone.
  • The EU General Product Safety Regulation (GPSR) requires manufacturers to mark products with a type, batch or serial number or another identifying element. A type number alone identifies the model, not the production run.
  • For products covered by the GPSR, a manufacturer whose product presents a risk has to inform the authorities through the Safety Business Gateway, notify the supply chain and take corrective measures.
  • At GEROM, defects are handled within an ISO 9001 quality management system. A replacement batch that is not available from stock is made within the standard 30-day production cycle.

Most conversations about furniture quality happen at the wrong time. Usually it's the sample stage, when everything looks great and nobody has opened and closed a cabinet door a few hundred times yet. Or it's delivery day, with the boxes still sealed and everyone smiling for the handover photo.

Hardly anyone talks about the moment that actually costs money: a shipped batch turns out to have a problem. Most distributors learn how their supplier handles that at the worst possible time. We'd rather talk about it now.

Why furniture defects show up late

On a well-set-up line, a cracked weld or a chipped corner is rare. Rare is still not never. Steel, board and coatings all fail occasionally, and a supplier who promises zero defects is promising something no production line in the world can guarantee.

The real trouble is timing. Almost nothing gets spotted during unloading. Chairs are stacked and stored, sometimes in a corridor for three weeks because nobody can find the key to the storage room. A school may only notice a loose leg after a pupil has spent a whole semester leaning back on it. (He was going to lean back no matter how well the chair was built.)

By then the order is closed, the invoice is paid, and the school calls the distributor.

Batch number: the detail that decides how fast a claim gets answered

One wobbly chair raises a question that matters far more than the chair itself: is this one unit, or every unit made in that run? Without a way to connect the product to its production run, nobody can answer that quickly, and the distributor ends up inspecting the whole delivery to be safe.

The EU General Product Safety Regulation (GPSR) requires manufacturers to mark products with a type, batch or serial number, or another element that identifies them. There's a nuance here. The regulation accepts a type number on its own, and a type number tells you the model, but not the run. Two suppliers can both be compliant, and only one of them can tell you which other chairs came off the line in the same week as the faulty one. So when you talk to a supplier, ask what the marking on the product leads back to.

For products covered by the GPSR, the stakes go up when a defect is a safety issue. If a product presents a risk, the manufacturer has to inform the authorities through the Safety Business Gateway, notify the economic operators in the supply chain and take corrective measures. A chair leg that gives way under a pupil falls squarely into that category, and a distributor wants to know in advance how its supplier would handle it.

What happens on our side

Defects are handled within our ISO 9001 quality management system. The standard requires a set sequence when something nonconforming is found: react to it, find the cause, check whether the same problem could exist elsewhere, act on it, and keep records of what was done. That third step is exactly the batch question above, and the procedure requires it every time.

Five steps of handling a defect claim within an ISO 9001 quality management system: record the defect and contain it, find the cause in material, process or machine setting, check whether other units from the same run are affected, correct the cause and replace faulty units, and keep records of every case
How a defect claim is handled within our ISO 9001 quality management system.

How the parts are made also helps with finding the cause. All welding on our frames is done by robotic cells, and powder coating runs on an automatic line. When a weld or coating problem appears, the likely source is a program or a machine setting, and a setting applies to everything produced with it in that run. That tells us where to look next.

For a distributor there's one more practical point. When you buy from GEROM, the supply contract is with GEROM Sp. z o.o., a company registered in Poland. A claim is handled with an EU counterparty, under an EU contract, in the same place the order and the invoice came from.

Plan the timeline realistically

School furniture is made in series. Unless replacement units come from stock, a replacement batch has to be produced, and our production cycle is 30 days. That's worth building into the conversation with the school from the start. If a supplier promises a full batch replacement within a week, it's fair to ask whether that model is actually sitting in a warehouse.

Why order five is riskier than order one

A first order gets treated like a job interview. Every detail is checked twice. By order five, a distributor naturally checks less, and the supplier's side can drift in the same direction: the account feels settled, attention moves to new clients. Nobody keeps their guard up forever.

What protects both sides is a procedure that runs the same way however long you've worked together. Under ISO 9001 the steps for handling a nonconformity are the same for a first order and a twentieth, and the records from earlier cases stay on file.

Questions to ask a supplier before you need the answers

What's on the product that links it to a production run? If a batch arrives with a flaw, how do you find out whether other units are affected? What's the realistic time to a replacement, given your production cycle? And who on your side handles the claim?

A supplier who has handled claims before will usually have these answers ready on the first call.

If you'd like to go through how this works for your product range and volumes, get in touch below.

Sources: Regulation (EU) 2023/988 on general product safety (GPSR); ISO 9001:2015 Quality management systems.

Questions distributors ask

Does the GPSR require a batch number on furniture?

For products covered by the GPSR, manufacturers must mark products with a type, batch or serial number or another identifying element. A type number alone is allowed, but it doesn't link a product to a specific production run.

What should a distributor ask a furniture supplier about defect claims?

How the product is linked to its production run, how the supplier checks whether other units are affected, the realistic replacement time given the production cycle, and who handles the claim.

How does GEROM handle defect claims?

Claims are handled within an ISO 9001 quality management system, which requires identifying the cause, checking whether the same issue may affect other units, and recording corrective action. When you buy from GEROM, the contract counterparty is GEROM Sp. z o.o., registered in Poland.

How long does a replacement batch take?

Unless units are available from stock, a replacement batch is produced within the standard 30-day production cycle, plus delivery time.

Planning a first order?Ask how claims, batch records and replacement timelines work for your range and volumes.
Get in touch
Inside GEROMA LinkedIn newsletter for distributors and buyers of school and office furniture: how it's made and why it lasts.
Subscribe on LinkedIn
Yevhenii HerasymovychCEO at GEROM · LinkedIn profile